The platform used during the offshore phase (23 October-18 December 2017) is the Fugro Synergy, a purpose-designed geotechnical vessel equipped with a permanent drilling rig.
- About ECORD
- Expeditions
- Science
- Outreach
- Education
- Resources
Select Page
The platform used during the offshore phase (23 October-18 December 2017) is the Fugro Synergy, a purpose-designed geotechnical vessel equipped with a permanent drilling rig.